 |
Spex in prep room. |
 |
John Rayner thinking what do we do first. |
 |
Lars took care of our cooling needs. |
 |
BigDog & GuideDog - show the cable configuration. |
 |
The Dewar with all the MIM Racks. |
 |
John running the software, while Lar waits. |
 |
Close up of the VME rack. |
 |
The Back of LittleDog's MIM Rack. |
 |
Using the crane to lift the MIM racks. |
 |
Putting the MIM Racks on the crate. |
 |
2nd MIM Rack. |
 |
The Telescope before Spex. |
 |
Lifting MIM racks with. |
 |
MIM Assemble on Platform. |
 |
Now the Dewar. |
 |
Spex jacked up ready for mounting. |
Note: Missing picture of spex being lifted and transported
to the platform because the camera's battery ran low.
 |
More Spex. |
 |
More Spex. |
 |
Spex with one happy PI. |
 |
Another View |
 |
Now tip the telescope. |
 |
Checking for clearance. |
 |
More Spex. |
 |
More Spex. |
 |
With George, Sammy, Lars, Danley, and Tony. |
 |
An inch to spare. |
 |
Looking down on to the mirror. |
 |
Peter O checks cable while Lars stikes a pose. |
 |
More Spex. |
 |
More Spex. |
 |
More Spex. |
 |
More Spex. |
 |
Yet another one. |
 |
Alan and John posing with spex |
|